|
|
|

Nacelle/generator unit for turbine 2A arriving on site.
|

Close-up of nacelle/generator unit for turbine 1A.
|
|

Base of turbine 1A.
|

Preparing base of turbine 6A.
|
|

Pouring concrete on site 7A.
|

Pouring concrete on site 7A.
|
|

Crane placing turbine tower sections on 2A.
|

Crane placing turbine tower sections on 2A.
|
|

Crane placing turbine tower sections on 2A.
|

Crane placing turbine tower sections on 2A.
|
|

Crane placing turbine tower sections on 2A.
|

Turbine blade being transported by truck to site 2A.
|
|

Turbine blade being transported by truck to site 2A.
|

Turbine blade being transported by truck to site 2A.
|
|

Turbine blade being transported by truck to site 2A.
|

Turbine blade being transported by truck to site 2A.
|
|

Crane placing base unit on 4A.
|

Turbine tower sections being placed.
|
|

Turbine tower sections being placed on 4A.
|

Turbine tower sections being placed on 4A.
|
|

Inside of turbine tower section.
|

Site of turbine number 5A.
|
|

Turbine number 2A.
|
Turbine 4A being flown in.
|

Turbine 4A being flown in. |
|
|
|
|
|

|

|

|

|
 |
 |
 |
 |
| |
|