About Benefits News FAQ Contact First Wind

Gallery



Construction

Nacelle/generator unit for turbine 2A arriving on site.

Close-up of nacelle/generator unit for turbine 1A.

Base of turbine 1A.

Preparing base of turbine 6A.

Pouring concrete on site 7A.

Pouring concrete on site 7A.

Crane placing turbine tower sections on 2A.

Crane placing turbine tower sections on 2A.

Crane placing turbine tower sections on 2A.


Crane placing turbine tower sections on 2A.

Crane placing turbine tower sections on 2A.

Turbine blade being transported by truck to site 2A.

Turbine blade being transported by truck to site 2A.

Turbine blade being transported by truck to site 2A.

Turbine blade being transported by truck to site 2A.

Turbine blade being transported by truck to site 2A.

Crane placing base unit on 4A.


Turbine tower sections being placed.

Turbine tower sections being placed on 4A.


Turbine tower sections being placed on 4A.

Inside of turbine tower section.

Site of turbine number 5A.

Turbine number 2A.

 Turbine 4A being flown in.



Turbine 4A being flown in.
 

 
Operations